How to tell an industry event from a new rule
A 24 October 2026 Canton Fair exchange meeting carried zero standard numbers and no effective date. Three text signals for judging report genre.
Research archive
China technology, AI, robotics, consumer electronics, sourcing signals, and product opportunities explained for global readers.
A 24 October 2026 Canton Fair exchange meeting carried zero standard numbers and no effective date. Three text signals for judging report genre.
IEC TS 62196-7:2026 (published 29 January) covers DC vehicle adapters; ISO 10604:2026 covers beam-aim measurement. Neither creates DoC obligations; SAMR press came later.
ATEX testing authorisation for CQC, IECEx recognition counts, Petronas accepting CCC in 2026 — and why each market still asks for its own document.
Russia can suspend or void EAC papers issued in other EAEU states. Three checks: issuing body, unified-register filing, sample GTD. Dates differ across sources.
Field 1 shows who answers for the product; field 5 names the test report and the lab accreditation. A field-by-field guide to the EAC declaration form.
33 products, 10 substances, platform self-declaration — and 23 additions waiting until 2027. Five audit checkpoints for a China RoHS file, not an export rule.
Auto Care Association released ACES 5.0 and PIES 8.0 on 2 April 2026: what changed in Package Segment EPR data and MfrLabel, and what these records are not.
Change control starts in the purchase order: notification classes under J-STD-046A, the five PCN fields to record, and the EU declaration that silently ages.
A complete RFQ names the controlled drawing, material standard, fit codes and EN 10204 3.1 in the order — the certificate that cannot be issued afterwards.
An equivalent part is a substitute needing written approval. Five documents to require, and the fields datasheets hide: pinout, temperature range, marking.