Evidence status: facts checked on 5 November 2026 against the IEC Webstore page for IEC TS 62196-7:2026, the ISO page for ISO 10604:2026, and the SAMR press items of 27 October 2026 in English and Chinese. This is an editorial documentation record about document attributes, not legal advice.

Who published what, and when
Two different documents, two different publishers, one release window. IEC TS 62196-7:2026 was published on 29 January 2026 by the IEC (IEC Webstore page). ISO 10604:2026 reached stage 60.60 on 13 January 2026 at ISO (ISO page); it is the second edition, replacing ISO 10604:1993. The SAMR press item of 27 October 2026 (English text) is a communication event roughly nine months after those publication dates — it reports participation, and it is not the publication act; SAMR is not the publisher of either document. Neither document imposes a compulsory effective date: the IEC technical specification comes up for stability review in 2027, and ISO 10604 is a voluntary international standard.
IEC TS 62196-7: DC vehicle adapters, GG to AA/BB
IEC TS 62196-7, “Plugs, socket-outlets, vehicle connectors and vehicle inlets — Conductive charging of electric vehicles — Part 7: Vehicle adapters” (Edition 1.0, 47 pages, IEC TC 23/SC 23H), is a technical specification for DC vehicle adapters up to 1500 V DC: safety, interoperability and compatibility requirements plus a table of standard configurations, adapting the GG vehicle inlet to AA/BB vehicle connectors. It does not cover adapters between an EV socket-outlet and an EV plug, or between an AC connector and an AC socket-outlet. The TS marker means a technical specification — a published engineering document, not a compulsory standard.
ISO 10604:2026: how beam aim is measured
ISO 10604:2026, “Road vehicles — Measuring procedure for aiming of luminous beams of front lighting devices” (ISO/TC 22/SC 35), is a measurement and verification procedure: test conditions, the zone and reference planes, vehicle preparation, the beam-aiming screen method, the movable test system method and photometry. It says how aim is measured; it sets no limit values and is not a certification route. The SAMR item describes it as the first international standard revised with Chinese experts serving as project leaders (SAMR Chinese text) — a participation claim from the press release, not a statement of legal effect.
Editorial recommendation
Our suggestion for sourcing notes that mention these documents is to attach a short attribute line to each: publisher (IEC or ISO), document type (technical specification or international standard), what it decides (adapter configuration between GG and AA/BB, or how beam aim is measured), and what it does not do — neither document generates declaration-of-conformity obligations, and neither is an EAC conformity document. This is editorial practice, not an official procedure.
Limits
We did not read the full clause texts and did not test any adapter or lamp; scope details follow the two catalogue pages and the SAMR descriptions, and no individual conformity file was verified. External links were checked on 5 November 2026.
For related sourcing notes, see the FYZSXNB intelligence desk.
